Find projects
How these quantities are calculated
Each bid item's quantity comes from TxDOT's bid data on the Texas Open Data Portal. For a project that has already let, the quantities are the low bid. For an upcoming project, they are the advertised quantities.
Each bid item is converted to material using its width, thickness and type, and the default rates of Bickley Consulting Services, LLC below. Line materials are stated by the foot of line: paint and multipolymer as feet per gallon, thermoplastic and profile as pounds per foot, glass beads by the mile and per 100 square feet. Quantities are in-place material. No waste allowance is added.
Rumble bars, raised pavement markers, preformed markings and pavement sealer are counted as bid, by the each or by the linear foot. Centerline and edgeline rumble bars are 1-foot bars, so each foot bid is one bar. Removal and surface preparation are listed but not counted. Items that have not been classified yet are listed as held out and are never estimated. Work zone markings (Item 662) are shown on their own and are never in the material totals. The bid does not say which material will be used, so non-removable work zone lines are figured as Type II (waterborne paint and glass beads) for estimating only; the plans' general notes sometimes call for another type. Short-term tabs, buttons, markers and removable tape are counted as bid.
Thermoplastic, profile thermoplastic, paint and multipolymer are also broken down by color, taken from each bid item's description. The colors always add up to the material total. Use + Show colors under a material to see them. A color can be left out in Choose items; that material's total then covers only the colors still chosen.